A WEIGHTY PERFORMANCE: STACKER CRANE WITH PAYLOAD OF 7.7 TONS
The high-bay warehouse is located at a critical interface with laminate production Fiberboards undergo a maturing process that spans several days Existing high-bay warehouse from another supplier
Pallet handling with half width and maximum payload The combination of factors such as overall height, payload, loading volume, and off-center loading presents an extreme scenario Assembly of the stacker crane during full production operation
Special design for the stacker crane Focus: Maximum safety, cost effiency, compliance with the requires clearance performance Sensitive but successful integration of the new components into the existing high-bay warehouse